Archive for March 1st, 2010

 

Dirt

Mar 01, 2010 in News

pbpic2677925

I the words that E2 stole from Big. “Do work son!”. As everyone knows the dirt jumps have been in need of some major attention. We ALL talk about how we want to get out and ride them but no one has put forth any effort to work on them. It seems that some of the 20″ guys wanted to ride so they got out and did work. We need to follow there lead. As usual with anything we do its last minute and not many details have been set but. Sunday at the quarry. Lets get some work done.

We need to get some drainage issues fix before the spring rain hits and makes things worse. The landing off the box jump and the super booter are really beat. The area between the box and super booter is still trashed (whats new). A new line has been started and the rain set in and it hasn’t been touched since. The tabletop line is completely gone (which most of you don’t really care about but my 5 year old still cant hit doubles so I do). There is so much potential out there that we need to take advantage of.

I realize that everyone has a life besides riding and working. If you can only make it out for 2 or 3 hours that is 2 or 3 more hours than nothing. Lets get the park ready for spring and summer. The more work we get done now the less we have to do later.

Thanks for the help and pass the word along.

Maybe with some work and a lot of luck we can have a park like this one of these days.